Connecting sensors to the monitor – ADS Environmental Services FlowShark QR 775002 A4 User Manual

Page 79

Advertising
background image

Sensor Installation and Connection 3-45

Connecting Sensors to the Monitor

After installing the ring and sensors and securing the sensor cables
to the pipe and manhole wall, connect the sensor cables to the
appropriate ports on the top of the monitor. The ports are labeled to
identify the appropriate connection for each sensor.

Connect the sensor cables to the monitor ports in the following way:

1. Place the monitor in an upright position to view the monitor

connector ports.

Cable connector ports for single (top) and dual monitoring points (bottom)

Advertising