Monitor Installation

After installing the sensors and establishing communications, install
the FlowShark

®

monitor in the manhole. The monitor mounts inside

the manhole by an aluminum mounting bracket attached to the
monitor and bolted to the manhole wall or rim. The following
procedures for monitor installation apply to most sites. However,
because manholes differ in many ways, some sites may require the
installer to implement slight modifications to the standard
installation technique.

Before installing the monitor at the site, activate the monitor to
verify that the monitor is configured correctly for the application
and that the battery packs (or external power) are operating at an
adequate voltage. Make any necessary changes to the configuration
before
mounting the unit. Refer to Chapter 10, Maintenance and
Troubleshooting
, for information on replacing the battery packs, if
necessary.

Note: Manhole and sewer system work involves confined
space entry and is inherently dangerous. Therefore,
installers and technicians must comply with all federal,
state, and municipal regulations concerning confined space
entry. ADS

®

is not responsible for any injuries, damages,

claims, or liability resulting directly or indirectly from the
use of this installation guide or the installation of any ADS
equipment.