Bio-Rad S3™ Cell Sorter User Manual

Page 114

Advertising
background image

104 | S3 and S3e Cell Sorters

Maintenance

After the AutoGimbal system has completed its alignment and found the most optimal position,
system calibration and drop delay calculation will begin automatically.

39. Select the bead lot from the dropdown menu and click the checkmark (Figure 126).
40. Load 500 µl ProLine

Universal Calibration or ProLine Calibration Beads into a 5 ml tube

and place into the sample station.

41. Move the loading stage into running position.

Fig. 126. Calibration Bead selection window.

Fig. 125. Automated alignment process windows.

Fig. 127. Automatic Tip Swap window.

Advertising
This manual is related to the following products: