Adept s650HS Quattro User Manual

Page 54

Advertising
background image

Chapter 3: Robot Installation - HS

Ground bolt

and label

Figure 3-12. Cable Inlet Box, showing Ground Label

2. Install the M4 protective earth ground bolt, with toothed washer, through the cable inlet

box into the AIB/eAIB. See the preceding figure.

l

Ensure that the protective earth ground wire lug is under the toothed washer.

l

This bolt does not need Loctite.

l

Torque the bolt to 1.1 N·m (10 in-lb).

3. Attach the cable inlet box back cover with four M4 x 16 bolts.

l

Ensure that the gasket is seated between the cover and the cable inlet box.

l

Put one washer seal under each bolt head.

l

Use Loctite 222 in these bolt holes, not on the bolts themselves.

l

Torque bolts to 1.1 N·m (10 in-lb).

Adept Quattro User's Guide, Rev F

Page 54 of 196

Advertising