Holidays, Holiday day selection, Holiday start/stop times – Auto-Zone Control Systems Auto-Zone Basic Systems Installation & Operation (Version 02C) User Manual

Page 83

Advertising
background image

Auto-Zone Basic

Section 3

Programming 3-15

Holidays

Holiday Day Selection






Holiday Start/Stop Times

The screens will step through the eleven possible holidays one
at a time. Line 2 shows which holiday is currently being
programmed.

Remember to combine the month and day into a single four-
digit value.

EXAMPLE: 704 = July 4th

1225 = December 25th

Program Holidays

Holiday # 1

Start Mon/Day: 101

(EX: 101 = Jan. 1)

The eleven holidays all use the same Start and Stop
time
which is entered on this screen. It is entered in 24-
hour military format, the same as a regular week
schedule.

Holiday Schedule

Starting Time: 0

Stopping Time: 0

Advertising