Chapter 8 verification, Power-up test, Operational test – Verilink 8100A (34-00237) Product Manual User Manual

Page 247: Power-up test -1, Operational test -1, Chapter 8, "verification, Erification

Advertising
background image

V e r i f i c a t i o n

8-1

C

H A P T E R

8

C

HAPTER

8

V

ERIFICATION

This chapter describes how to verify that the 8000 Series IADs operate
properly after installation. It also covers maintenance and how to display the
current configuration. Before you can test the voice capabilities of the IAD,
you must first provision it at the voice gateway and configure the voice
application and parameters as described beginning on page 4-61.

Power-up Test

The IAD displays an indication of normal operation when you first power it
up. When you power it up, verify that the POWER indicator on the front
panel lights green.

Operational Test

Follow the procedure below to verify that the IAD is operating properly after
installation. This procedure assumes that

You have configured Directory numbers (DNs) in the Class 5 switch for the
associated Voice Ports.

The IAD has been connected to a terminal emulator via the console port,
displays the normal boot sequence and you can log in.

You have configured PVCs at the DSLAM (default data = 0, 38; default
voice is 0, 39) when using ATM.

You have provisioned a data network.

You connected and configured a WAN link at the associated DSLAM or
voice gateway. For more information, see WAN Configuration on page 4-2.

You have a PC with Telnet, and an Ethernet adapter running TCP/IP. For
more information, see Connecting via Telnet on page 2-9.

For testing, you and a counterpart logged on to the upstream voice gateway
can communicate via telephone or cell phone.

Advertising