Emerson E2 User Manual

Page 263

Advertising
background image

I

-

3

EEVs 11-11

sensor default locations 9-14
sensor failures 11-1511-16
sensors

default installation locations 9-14

setting up individual CC-100s 11-16
specifying the number of 10-2, 10-16
stand-alone mode 11-15
superheat control 11-11
temperature control 11-11
temperature probes

installing 9-14

valve cable 9-15
valves 11-11

EEPRs 11-12
EEVs 11-11
liquid pulse 11-11
liquid stepper 11-11
pulse 11-11
stepper 11-11
suction stepper 11-12

walk-in freezer control 11-15
wash mode. See Clean Mode. 11-14

CC-100H. See Case Controllers.
CC-100LS. See Case Controllers.
CC-100P.
See Case Controllers.
Checking Boards Online 10-16, 12-11
Checking Status Screens 12-11
Clean Mode 11-14, 12-9

initiating 12-9

Clean Out 10-1
Clean Switches 11-7
Cold Reset

performing a 10-1

Cold Reset Button 10-1
COM Port Setup 5-1
Commissioning 10-17
Commissioning CC-100s 10-17

how commissioning works 10-17

Commissioning MODBUS 10-17
Compressors

troubleshooting F-3

Condensers

air cooled 11-3

strategy 11-3

bypassing fan stages 12-10

evaporative 11-4
fail-safe dip switch setup 11-5
fan control 11-4

single-speed 11-4
two-speed 11-4
variable-speed 11-4

fast recovery 11-4
hardware overview 11-4
input types 11-5
output wiring 11-5
overriding compressor stages 12-10
problems with F-5
split mode 11-4
Temperature Differential Strategy 11-3

Control Keys 12-8
Convenience Store Controller 1-3
Cool cut in/cut out setpoints 11-52
Copeland Digital Discus Compressor 11-1, 11-2
CPU 2-2
Creating 10-14
CS-100 11-10
CS-100.
See Case Controllers, CS-100
CT Drives 6-6
CUB 2-7, 11-30
CX Home Screen 12-2
-D-
Daisy Chains

diagram of 6-2

Date and Time 12-12
Date Setup 10-9
Daylight Savings Dates 10-10
Defrost

defrost cycle 11-6, 11-12
demand 11-13

fail-safe time 11-13

drip time. See Defrost, run-off time.
electric 11-13
emergency 11-13

initiating 12-9

hot gas 11-12
in case controlled circuits 11-12
inhibiting, using demand sensors 11-13
manual defrost

ending a cycle 12-10
initiating 12-9

off-cycle 11-12

Advertising