Echelon, Rs485 i/o or modbus net – Emerson E2 User Manual

Page 57

Advertising
background image

Battery Testing and Replacement

E2 Hardware Setup

4

-

7

NOT TERMINATED

TERMINATED

Echelon

JP7

1.Connect the I/O or MODBUS Network to one or both of the E2
RS485 I/O or MODBUS Network ports. (A maximum of 31 devices
can be wired to each I/O or MODBUS Network port.)
2. For each I/O or MODBUS Network port, set RS485 termination
jumpers UP if at either end of a daisy chain. Otherwise, set jumpers
DOWN.
3. Connect the E2 to the Echelon Network. If possible, connect shield
wires to a separate earth ground outside of the E2 enclosure.
4. Set the Echelon Network jumper UP (Terminated) if the E2 is
at either end of an Echelon daisy-chain. Otherwise, set the jumper
DOWN (Not Terminated).
5. Connect earth ground to one of the two ground terminals
provided. Use 12 AWG (preferred) or 14 AWG wire and keep as
short as possible (less than 12 inches preferred).
6. Connect 24VAC to the power terminals.
7. Flip the power switch to the ON position. When 24VAC has been
applied to the board, the green LED will illuminate.

4

3

Earth
Ground
Connector

AC1

AC2

AC1

AC2

24VAC

24VAC

6

12 or 14 AWG

RS485 I/O or MODBUS Net

JP7

Level IV, 22 AWG, Shielded

Max Daisy Chain Length:
Feet: 4592 Meters: 1400

P/N 135-2300 Non-Plenum

P/N 135-2301 Plenum

(1 Pair, 1000 Feet)

(1 Pair, 1000 Feet)

NOT TERMINATED

TERMINATED

BLA

C

K

SH

IELD

WH

ITE

TO OTHER
RS485
DEVICES

_

0V

+

I/O or MODBUS Network

Echelon

LON

LON

TO OTHE

R

ECHELO

N

DEVICES

TO

OTH

ER

ECH

ELO

N

DEV

ICE

S

Earth
Ground

SHIELD

7

6

OBSERVE WIRE
COLOR POLARITY

Advertising