Implementation summary
195
a. Upgrade the main office software to CS 1000 Release 5.0. Refer
to , Communication Server 1000E Upgrades (NN43041-458)
orCS 1000M and Meridian 1 Large System Upgrades Overview
(NN43021-458).
b. If not already implemented, implement IP Peer Networking
as part of a system installation or upgrade. Refer to IP Peer
Networking Installation and Commissioning (NN43001-313) .
c. Configure the Branch Office zones. See
"Configuring ESN and MG 1000B zones" (page 210)
.
d. Configure the Branch Office dialing plan. See
.
e. Configure the IP Phone passwords. See
and changing the Station Control Password Configuration" (page
216)
f.
Use NRS Manager to add the System Host Name of the MG
1000B Signaling Server to the H.323 endpoint list. This action
enables the Signaling Server at the Branch Office to register with
the Gatekeeper (H.323). Refer to IP Peer Networking Installation
and Commissioning (NN43001-313) .
2
For each Branch Office:
a. Install the MG 1000B Core. See
.
b. Install the MG 1000B Signaling Server. See
.
c. Install the Branch Office software, starting with CP-PM Call
Server and MGC.
Software for the MG 1000B CP-PM Call Server and MGC
comes with preprogrammed data that can be selected during
the installation procedure. For more information, see
"Preprogrammed data" (page 361)
d. Configure the Branch Office (Customer Data Block and ELAN
subnet). See
Procedure 23 "Configuring the MG 1000B zone"
.
e. Configure the Branch Office dialing plan. See
.
f.
Configure the Voice Gateway Media Cards. Refer to IP Line
Fundamentals (NN43100-500).
Use the same zone for DSP physical TNs and IP Phone TNs.
The zone number must match that at the main office. Refer to IP
Line Fundamentals (NN43100-500).
Nortel Communication Server 1000
Branch Office Installation and Commissioning
NN43001-314
01.02
Standard
Release 5.0
20 June 2007
Copyright © 2007, Nortel Networks
.