5 top hat rail mounting, Top hat rail mounting -36, Section 3.6.5 – YSI IQ SensorNet 2020 XT Terminal User Manual

Page 66

Advertising
background image

Installation

System 2020 XT USB

3 - 36

ba76019e01

12/2012

3.6.5

Top hat rail mounting

Materials required

 THS/IQ kit for top hat rail mounting (see chapter 10 A

CCESSORIES

AND

OPTIONS

).

Tools

 Phillips screw driver.

Mounting the

MIQ module on a top hat

rail

Fig. 3-25 Mounting the MIQ module on a top hat rail

1

Screw the clamping assembly (pos. 1 in Fig. 3-25) onto the
back of the MIQ module with the two plastic tapping screws
(pos. 2).

2

Attach the MIQ module onto the top hat rail from above using
the clamping assembly and press against the rail until the
clamping assembly clicks into place. The MIQ module can be
moved sideways afterwards.

3

To unhook the MIQ module, press it downwards and pull it
forwards at the bottom.

1

2

For stack mounting remove label

and install contact carrier

Advertising