Configuration, 1 network design, 2 network definition – Yokogawa digitalYEWFLO (DY-FF) User Manual

Page 18: 1 network, Design, 2 network, Defi nition -1, 2 network defi nition

Advertising
background image

<5. CONFIGURATION>

5-1

IM 01F06F00-01EN

5. CONFIGURATION

This chapter describes how to adapt the function
and performance of the digitalYEWFLO to suit
specifi c applications. Because multiple devices are
connected to Fieldbus, it is important to carefully
consider the device requirements and settings
when confi guring the system. The following steps
must be taken.

(1) Network design

Determines the devices to be connected to

Fieldbus and checks the capacity of the power
supply.

(2) Network defi nition

Determines the PD tag and node addresses for

all devices.

(3) Defi nition of combining function blocks

Determines how function blocks are combined.

(4) Setting tags and addresses

Sets the PD Tag and node addresses for each

device.

(5) Communication setting

Sets the link between communication

parameters and function blocks.

(6) Block setting

Sets the parameters for function blocks.

The following section describes in sequence each
step of this procedure. The use of a dedicated
confi guration tool signifi cantly simplifi es this
procedure. Refer to APPENDIX 7 “LINK MASTER
FUNCTIONS” when the digitalYEWFLO is used as
Link Master.

5.1 Network

Design

Select the devices to be connected to the Fieldbus
network. The following are essential for the
operation of Fieldbus.

• Power supply

Fieldbus requires a dedicated power supply. It

is recommended that current capacity be well
over the total value of the maximum current
consumed by all devices (including the host).
Conventional DC current cannot be used as
power supply.

• Terminator

Fieldbus requires two terminators. Refer to

the supplier for details of terminators that are
attached to the host.

• Field devices

Connect

the

fi eld devices necessary for

instrumentation. The digitalYEWFLO has passed
the interoperability test conducted by The
Fieldbus Foundation. In order to properly start
Fieldbus, it is recommended that the devices
used satisfy the requirements of the above test.

• Host

Used for accessing fi eld devices. A minimum of

one device with bus control function is needed.

• Cable

Used for connecting devices. Refer to “Fieldbus

Technical Information” (TI 38K03A01-01E) for
details of instrumentation cabling. Provide a
cable suffi ciently long to connect all devices. For
fi eld branch cabling, use terminal boards or a
connection box as required.

First, check the capacity of the power supply.
The power supply capacity must be greater than
the sum of the maximum current consumed by
all devices to be connected to Fieldbus. For the
digitalYEWFLO, the maximum current (power
supply voltage: 9 to 32 VDC) is 15 mA. The cable
used for the spur must be of the minimum possible
length.

5.2 Network

Defi nition

Before connection of devices with Fieldbus, defi ne
the Fieldbus network. Allocate PD tags and node
addresses to all devices (excluding such passive
devices as terminators).
The PD tags are the same as conventional
tag numbers assigned to devices. Up to 32
alphanumeric characters may be used for defi nition
of the PD tag for each device. Use hyphens as
delimiters as required.

Advertising