Power supply – HP NonStop G-Series User Manual

Page 147

Advertising
background image

If the SP on this PMF2 is designated as Active (Primary), resets the SP so that the peer SP
becomes primary

Disables the battery

Halts the processor on this PMF2 CRU

If the Prepare to Power Off action completes successfully, you can safely remove the CRU.

If the check fails, the Prepare to Power Off action fails, and you should perform the steps using other
OSM actions before removing the CRU.

Replace

Launches the Replace PMF guided procedure, which provides step-by-step instructions for replacing
the PMF2 CRU.

Storage ASIC Initialization Test

Prompts the storage subsystem manager process ($ZZSTO) to initialize the storage ASIC in the
CRU. If initialization fails, an alarm is generated.

This action is triggered automatically when a new CRU is inserted while OSM is running or when an
SCF STATUS ADAPTER command is issued. If a CRU is inserted while OSM is not running,
perform this action after logging on to the OSM Service Connection.

Test Verify

Performs some basic tests on the CRU. You can perform this action when the CRU is online.

Power Supply

The power supply converts standard AC line voltage and distributes DC power to all components in
its power domain. The power supply is:

A component of all the

IOMF

CRUs and

PMF

CRUs in NonStop S7000 servers

A separate CRU for enclosures containing

IOMF2

,

PMF2

, or PMF CRUs in NonStop S7400

or later servers

In Telco systems, the power supply units displayed in slots 31 and 32 of the OSM GUI
represent up to 4 Telco Isolating Converters (TICs) in positions A1, A2, B1, and B2. For
information on installing or replacing power components in a Telco system, see the NonStop
S-Series Central Office Server Installation and Service Guide
.

Location in OSM Tree:

Component: System > Group > Module > CRU > Power Supply

CRU: System > Group > Module > Power Supply

Advertising