3 replacing the communication module, Replacing the communication module, 5installation – Lenze E84AYCEO User Manual

Page 26

Advertising
background image

5

Installation

5.1

Mechanical installation

26

Lenze · E84AYCEO communication module (EtherNet/IP™) · Communication Manual · DMS 3.0 EN · 10/2013 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5.1.3

Replacing the communication module

[5-3]

Replacing the communication module

Mounting steps

1. Loosen the securing screw for the communication module at the standard device (1).
2. Pull the communication module out of the MCI slot of the standard device (2).
3. Insert the new communication module into the MCI slot of the standard device (3).
4. Tighten the securing screw again (4).

E84YCPM002B

Advertising