Electrical installation – Lenze E82EV 8200 vector 0.25kW-2.2kW User Manual

Page 119

Advertising
background image

Electrical installation

Wiring

EMC−compliant wiring

5

l

119

EDK82EV222 DE/EN/FR 13.0

Realisation

M

3~

PES

L < 500 mm

L < 40 mm

PE

PE

PE

8
9

PES

PES

1

2

3

4

5

6

7

0

8200vec008

0

Mounting plate with electrically conductive surface

1

Control cable to the function module, connect the shielding to the EMC shield sheet (PES) with a surface as large
as possible

2

2−pole terminal for motor PE and motor shield

3

PE of the motor cable

4

Shield of the motor cable

5

Shielded motor cable, low−capacitance
(Core/core 1.5 mm

2

£ 75 pF/m; from 2.5 mm

2

£ 100 pF/m; core/shield £ 150 pF/m)

6

Shielded PTC cable or thermal contact cable

7

Connect the cable shields to the EMC shield sheet (PES) with a surface as large as possible. Use the supplied
shield clamps.

8

Star or delta connection as indicated on the motor nameplate

9

EMC cable connector (not included in the delivery package)

Advertising