Safety instructions

General safety information

2

l

93

EDK82EV222 DE/EN/FR 13.0

ƒ For compliance with the limit values for radio interference emission at the site of installation,

the components − if specified in the technical data − have to be mounted in housings
(e. g. control cabinets). The housings have to enable an EMC−compliant installation. In
particular observe that for example control cabinet doors preferably have a circumferential
metallic connection to the housing. Reduce openings or cutouts through the housing to a
minimum.

ƒ Only plug in or remove pluggable terminals in the deenergised state!

Commissioning
ƒ If required, you have to equip the system with additional monitoring and protective devices in

accordance with the respective valid safety regulations (e. g. law on technical equipment,
regulations for the prevention of accidents).

ƒ Before commissioning remove transport locking devices and keep them for later transports.

Safety functions
ƒ Without a higher−level safety system, the described product must neither be used for the

protection of machines nor persons.

Maintenance and servicing
ƒ The components are maintenance−free if the required operating conditions are observed.
ƒ If the cooling air is polluted, the cooling surfaces may be contaminated or the air vents may be

blocked. Under these operating conditions, the cooling surfaces and air vents must be cleaned
at regular intervals. Never use sharp objects for this purpose!

ƒ After the system has been disconnected from the supply voltage, live components and power

connections must not be touched immediately because capacitors may be charged. Please
observe the corresponding notes on the device.

Disposal
ƒ Recycle metals and plastic materials. Ensure professional disposal of assembled PCBs.