MacDon M150 SP User Manual

Page 71

Advertising
background image

WINDROWER OPERATION

Form 169017 / 169087 / 169095

69

Revision C

g. Remove pins (D) from lower end of lift linkages.

NOTE

Pins (D) are also used to secure weight box
to windrower linkage.













h. Disconnect the center-link as follows:


HYDRAULIC LINK - M200 STD, M150 OPTION

1. Pull up on latch (E), and locate latch into

notch (F) on top of hook.

2. Release the safety lock on the header lift

cylinders.

3. Lower header down onto the transport wheels.

4. Disengage the top link from the header. Use

the header tilt switch to release load on the
cylinder if necessary.

NOTE

If optional self-alignment kit is installed, the
top link can be raised or lowered using the
Reel “UP” and “DOWN” buttons on the
GSL.

MECHANICAL LINK - M150

1. Loosen nut (G), and rotate barrel (H) to relieve

load on link.

2. Remove cotter pin on pin (J), and remove pin

to disconnect from windrower. Reinstall pin in
header.

i.

Back windrower away from header.

(continued next page)

J

H

G

D60 SHOWN

D60 SHOWN

E

F

D

Advertising
This manual is related to the following products: