Install Columns

Location Planning

When planning the location for your CENTERLINE 2500 MCC, consider:

Cable entry and exit points

Busways

Overall height of installation area

Alignment with other equipment

Future needs

Environment

The area must be level and the environment must be compatible with the degree
of protection provided by the enclosure.

ArcShield Clearance Space

You need a minimum 300 mm of clearance space above the MCC. This space is
needed to vent the pressure relief plates in case of an arc flash.

ATTENTION: Do not step on pressure relief plate. Stepping on plate
could cause it to not work properly during arc flash.

300 mm
Minimum Clearance

ArcShield pressure relief
plate on top of column.