Positioning the motor control center – Rockwell Automation 2500 CENTERLINE Motor Control Centers Installation Manual User Manual
Page 28

28
Rockwell Automation Publication 2500-IN001C-EN-P - April 2014
Chapter 3
Install Columns
Positioning the Motor Control Center
Follow these procedures for positioning your MCC.
1.
Documentation packages shipped with assembled MCCs include an
MCC elevation drawing with a floor plan layout. Locate and use this floor
plan layout for positioning your MCC columns.
2.
Identify the leftmost column.
3.
Position the MCC in the location where it is to be installed.
4.
Depending on the installation site, begin with the leftmost or right-most
column and install one shipping block at a time.
Refer to Receiving, Handling and Storing CENTERLINE 2500 Motor
Control Centers Instructions, publication
, for handling
guidelines.
TIP
The horizontal power bus does not extend past the leftmost MCC column.
For sequential columns, the horizontal power bus extends past the MCC.
IMPORTANT
The floor surface must be level.