Positioning the motor control center – Rockwell Automation 2500 CENTERLINE Motor Control Centers Installation Manual User Manual

Page 28

Advertising
background image

28

Rockwell Automation Publication 2500-IN001C-EN-P - April 2014

Chapter 3

Install Columns

Positioning the Motor Control Center

Follow these procedures for positioning your MCC.

1.

Documentation packages shipped with assembled MCCs include an
MCC elevation drawing with a floor plan layout. Locate and use this floor
plan layout for positioning your MCC columns.

2.

Identify the leftmost column.

3.

Position the MCC in the location where it is to be installed.

4.

Depending on the installation site, begin with the leftmost or right-most
column and install one shipping block at a time.

Refer to Receiving, Handling and Storing CENTERLINE 2500 Motor
Control Centers Instructions, publication

2500-IN002

, for handling

guidelines.

TIP

The horizontal power bus does not extend past the leftmost MCC column.
For sequential columns, the horizontal power bus extends past the MCC.

IMPORTANT

The floor surface must be level.

Advertising