Securing Single-front, Two-column-wide Shipping Blocks

The following instructions are for bolting down the MCC. See

Figure 13 on

page 35

for weld down requirements.

1.

Remove the bottom wireway cover to locate the front mounting channel.
See

Figure 3 on page 15

for cover location.

2.

Secure the front of the MCC to the foundation with the mounting
dimensions below and the mounting channel requirements on

page 29

.

3.

Replace the bottom wireway cover.

4.

Remove the bottom wireway endplate near the back of the unit to locate
the rear mounting channel. See

Figure 3 on page 15

for endplate location.

5.

Secure the rear of the MCC to the foundation with the mounting
dimensions below and the mounting channel requirements on

page 29

.

6.

Replace the bottom wireway endplate.

IMPORTANT

Verify there is adequate clearance on the exposed sides of columns to access
the rear mounting bolt locations.

Use steel M12 bolts (minimum Property Class 8.8) to secure columns to the
foundation. Not all bolt locations are used.

1200…2000

542…942

58

6

234

460…860

44

512…712

600…800

438…638

70

81

29

Protective earth
(PE) conductor

FRONT

REAR

542…942

First Column

= Mounting hole location not required.

Dimensions are in mm.

Diagram shows top view
of 600 and 800 mm
column depths.