Install Columns
Chapter 3
Control and Network Cables
When finished joining and splicing columns, make sure to connect network and
other control cables as required.
Refer to
Torque Specifications
Tighten bus splice connections with a torque wrench according to the table.
Torque values can be found on the information label on the interior of the vertical
wireway door or on the interior right side plate of fixed units.
Hardware Description
Hardware Size
Torque
Incoming line lug attachment bolts
M12 x 1.75
61 N•m
Horizontal power bus to vertical distribution bus connection
(1)
(1) The factory-made horizontal power bus to vertical distribution bus connections are tightened by a computer-
controlled torquing system.
M10 x 1.5
38 N•m
Horizontal power bus splice connection
M10 x 1.5
38 N•m
Protective earth conductor (PE) splice connection
M6 x 1.0
7.3 N•m
Column joining hardware
M6 x 1.0
6.2 N•m
DeviceNet splice cable screws
—
0.55 N•m
I/O terminal blocks
—
0.45 N•m