Install Columns
Chapter 3
Securing Double-front, One-column-wide Shipping Blocks
The following instructions are for bolting down the MCC. See
for weld down requirements.
1.
Remove the bottom wireway cover to locate the front mounting channel.
See
for cover location.
2.
Secure the front of the MCC to the foundation according to the
dimensions below and the mounting channel requirements on
3.
Replace the bottom wireway cover.
4.
Repeat steps 1 through 3 for the other side of the double-front shipping
block.
IMPORTANT
Use steel M12 bolts (minimum Property Class 8.8) to secure columns to the
foundation. Not all bolt locations are used.
600…1000
460…860
70
6
234
542…942
1196
438…638
29
81
438…638
6
234
FRONT OF UNIT 2
FRONT OF UNIT 1
Protective Earth
(PE) Conductor
Protective Earth
(PE) Conductor
Dimensions are in mm.
Diagram shows top view of
600 mm column depths.
158
= Mounting hole
location not required.