Index – Rockwell Automation 2500 CENTERLINE Motor Control Centers Installation Manual User Manual

Page 97

Advertising
background image

Rockwell Automation Publication 2500-IN001C-EN-P - April 2014

97

Index

A

altitude

24

ArcShield

clearance space

23

door latches

50

install latch bracket stiffener

46

pressure relief plate

16

B

bus splice kits

locating

26

C

cables

bracing

47

control

43

DeviceNet

77

,

83

incoming line lug

47

install

45

install considerations

45

joining DeviceNet

86

lugs

46

main disconnect switch

47

network

43

secure load wires

48

circuit breakers

operator handles

52

,

56

clearance space

23

closing unit door

51

,

55

column

construction

15

dimensions

14

front mounted configuration

16

install

23

joining

23

location planning

23

nameplate

18

splicing

23

commissioning

67

pre commissioning checklist

67

procedure

71

control cables

43

covers

27

D

DeviceNet

83

cable system

77

,

83

joining cables

86

terminating resistors

84

door latches

50

ArcShield

50

normal

50

E

environment

24

altitude

24

humidity

24

pollution degree

24

temperature

24

H

handling

22

humidity

24

I

incoming line lug

47

install

cables

45

lugs

46

J

joining DeviceNet cables

86

L

large rotary operator handles

54

location planning

23

locking units

in off position

53

,

56

in on position

53

in the on position

57

lugs

46

M

main disconnect switch

47

maintenance

73

suggested guidelines

74

MCC

DeviceNet

83

handling

22

layout worksheet

93

options

77

packaging

21

positioning

28

seismic requirements

38

sequence number

19

storage

22

unit descriptions

59

unit types

59

withdrawable units

60

megger reading recording table

94

module space

59

mounting arrangement

alternative

32

double-front

33

preferred

31

Advertising