Connect and commission the compactblock i/o module, Switch cover, Blue white red black – Rockwell Automation 1787-GEN2SKIT, -2, -3, -4, -5, -6, -7 DeviceNet Starter Kit User Manual User Manual

Page 69

Advertising
background image

Publication DNET-UM003A-EN-P - August 2000

Connect Devices and Commission Nodes 3-17

Connect and Commission the CompactBlock I/O Module

1. Open the switch cover on the CompactBlock I/O and check to

see if the rotary switches are set to the “switchless” setting of 99.
If they are not, set them to 99. You will be setting the node
address to 02 in RSNetWorx over the DeviceNet network.

2. Locate a micro to conductor cable and wire the conductor end

to the PLUG10R. Use a small screwdriver to open and close the
wire clamp on the PLUG10R. Refer to the publication
1791D-5.42, CompactBlock I/O for DeviceNet Modules
Installation Instructions for details.

3. Attach two 24V insulated wires to the output section on the

CompactBlock. The top bank is positive and the bottom bank is
negative.

0 1 2 3 4 5 6 7

0 1 2 3 4 5 6 7

Network

Status

Module

Status

CompactBlock

I/O

1791D-888P

8 INPUTS / 8 OUTPUTS • DC POWER

switch cover

41985

42120

Blue

White

Red

Black

Advertising