Rockwell Automation 1787-GEN2SKIT, -2, -3, -4, -5, -6, -7 DeviceNet Starter Kit User Manual User Manual

Page 76

Advertising
background image

Publication DNET-UM003A-EN-P - August 2000

3-24 Connect Devices and Commission Nodes

Connect and Commission the ControlTower Stack Light

1. Assemble the ControlTower Stack Light. Refer to the instructions

provided with the device. For our demonstration, we placed the
red Stack Light on the top and the green on the bottom.

2. Set the node address by hand to 03.

Use tool provided with the ControlTower Stack Light to set these
switches and refer to the instructions provided with the device
for details.

3. Connect the ControlTower Stack Light to a KwikLink tap.

Your network should look like this:

4. You should see a quick blink of each Stack Light when you

connect to the network.

I-0

A-0

I-1

A-1

O-0

O-1

Auxiliary Power

Network Status

Module Status

0 1 2 3 4 5 6 7

0 1 2 3 4 5 6 7

Network

Status

Module

Status

T

T

To scanner and interface

42039

Advertising