Rockwell Automation 1787-GEN2SKIT, -2, -3, -4, -5, -6, -7 DeviceNet Starter Kit User Manual User Manual

Page 70

Advertising
background image

Publication DNET-UM003A-EN-P - August 2000

3-18 Connect Devices and Commission Nodes

4. Attach the other ends of the insulated wires to a power supply.

We do not recommend that you use the DeviceNet power to power
I/O devcies. For the Starter Kit, use an alternative power supply to
power the CompactBlock I/O, if possible.

5. Insert the PLUG10R into the CompactBlock I/O module.

6. Connect the micro end of the cable to a KwikLink tap.

Your network should look like this:

7. Watch the LEDs. After the unit cycles you should see a flashing

green light at Module Status. Network Status should be off or
red. Once you have communicated with the scanner, it should
be green. If you don’t, check your connections and refer to the
installation instructions.

8. Go to RSNetworx.

0 1 2 3 4 5 6 7

0 1 2 3 4 5 6 7

Network

Status

Module

Status

Attach the wires to the
6th screw in each bank

42168

+

-

Attach the 24V insulated wires
to a 24V power supply

I-0

A-0

I-1

A-1

O-0

O-1

Auxiliary Power

Network Status

Module Status

0 1 2 3 4 5 6 7

0 1 2 3 4 5 6 7

Network

Status

Module

Status

42038

T

T

To scanner and interface

Advertising