9 making previous method version current, Making previous method version current 6 – Metrohm tiamo 2.2 (ProcessLab) User Manual

Page 1612

Advertising
background image

9.6 Methods

■■■■■■■■■■■■■■■■■■■■■■

1596

■■■■■■■■

tiamo 2.2 (ProcessLab)

The selected method will be signed on level 1.

Note

Methods can be signed more than once at level 1 and can also be
edited and deleted. If the method is edited and saved again, a new
version is created and all the signatures will be deleted i.e. the
method must be signed again.

Signature 2

Note

Methods can only be signed at level 2 if the user belongs to a user group
with the corresponding authorization (see Chapter 6.2.1.2.3, page
1226)
.

1 Click on the menu item Sign

Signature 2….

The dialog window Signature Level 2 opens. If the selected method
can be signed, Signature possible is displayed in the field Info.

2 Enter or select User, Password, Reason and Comment.

3 Click on [Sign].

The selected method will be signed on level 2.

Note

Methods signed at level 2 are locked, i.e. they can neither be edited
nor deleted. In order to be able to edit such methods again the sig-
natures as level 2 must first be deleted (see Chapter 2.3.5, page
24)
.

9.6.9

Making previous method version current

How to proceed?

1 Select program part Method.

2 Click on the symbol or menu item File Method manager….

Advertising