Operation, Operator’s manual, Pre-operating preparation – Great Plains DICKEY-john MVT Monitor Operator User Manual

Page 100

Advertising
background image

OPERATOR’S MANUAL

IntelliAg MVT

11001-1643-201401

OPERATION / 91

OPERATION

Before operating, did you run:

Auto configuration

Valve calibration

Continuous Test

5 Rev Test

PRE-OPERATING PREPARATION

Planters should perform a fill disk at every system startup or a variety/
seed-type change. This will ensure no voids are left in the field when
starting to plant.

FILL DISK FOR ALL CONTROL CHANNELS

1. At the Main Work screen, press the Planter Fill Disk button.
2. Raise the implement.
3. With brakes locked and transmission in the park position, start the

engine.

4. Engage hydraulics and run engine at normal speed until hydraulic fluid

is at operating temperature.

Implement will begin to operate after pressing the Start button.
Ensure that all persons and objects are away from the implement
to avoid personal injury.

5. Press the Start button. The seed meters will turn for 1 revolution, then

stop.

6. Pressing the Stop button will also terminate the test.

Figure 70

Fill Disk Screen for All Planter Controls

Advertising