Operator’s manual, Continuous test – Great Plains DICKEY-john MVT Monitor Operator User Manual
Page 60
OPERATOR’S MANUAL
IntelliAg MVT
11001-1643-201401
VEHICLE PREPARATION / 51
Figure 45
Fill Disk Screen for One Control Channel
CONTINUOUS TEST
Performing a Continuous Test runs the control while stationary for
troubleshooting or maintenance purposes. A remote test switch is
recommended to perform this test. The values entered will not affect any
other setup values that have previously been entered.
To Run Continuous Test:
1. Press the Controls button.
2. Press the Continuous Test button.
3. Enter values to perform a continuous test for
– Test Ground Speed
– Row
4. Press the Start button.
5. Press and hold remote test switch until the test is complete.
6. Release test switch and the control will stop.
7. Press the test switch again to clear the seed count and restart the
control.
8. Steps 2-4 will repeat until the Stop button is pressed.
Figure 46
Continuous Test Screen