Operator’s manual – Great Plains DICKEY-john MVT Monitor Operator User Manual

Page 20

Advertising
background image

OPERATOR’S MANUAL

IntelliAg MVT

11001-1643-201401

COMPONENT INSTALLATION

/

11

BOLT WSMB TO FRAME

1. Use the enclosure as a template to mark the location of the mounting

holes.

2. Drill two 9/32 inch diameter holes where marked.
3. Attach to frame using 1/4 x 20 bolts or other fastening devices as

illustrated in (

Figure 11

).

Do not use the enclosure as a guide when drilling. Do not
overtighten nuts as this may damage the mounting tabs on the
enclosure.

Figure 11

Working Set Member Installation (Bolted)

Advertising