Operator’s manual – Great Plains DICKEY-john MVT Monitor Operator User Manual
Page 20
Advertising
OPERATOR’S MANUAL
IntelliAg MVT
11001-1643-201401
COMPONENT INSTALLATION
/
11
BOLT WSMB TO FRAME
1. Use the enclosure as a template to mark the location of the mounting
holes.
2. Drill two 9/32 inch diameter holes where marked.
3. Attach to frame using 1/4 x 20 bolts or other fastening devices as
illustrated in (
Figure 11
).
Do not use the enclosure as a guide when drilling. Do not
overtighten nuts as this may damage the mounting tabs on the
enclosure.
Figure 11
Working Set Member Installation (Bolted)
Advertising