Vehicle preparation, Operator’s manual, Valve calibration – Great Plains DICKEY-john MVT Monitor Operator User Manual

Page 58

Advertising
background image

OPERATOR’S MANUAL

IntelliAg MVT

11001-1643-201401

VEHICLE PREPARATION / 49

VEHICLE PREPARATION

The following steps are recommended for proper system operation:

Valve calibration

Fill disk

Continuous test

5 Rev test

Auto Configuration

VALVE CALIBRATION

A valve calibration sets the machine hydraulic system parameters and
should be performed for best results. Each control channel that is enabled
requires a valve calibration.

NOTE:

Verify disc speed high limit is
set correctly. Valve calibration
will try and obtain the high disc
speed.

Figure 44

Valve Calibration Screen - Planter Control

CHANNEL ON

The Channel On button appears on this screen only if the channel is turned
off. The channel must be ON before performing a valve calibration. Press
the Channel On button to turn the channel on.

When the START key is engaged, the machine will become
operational. All necessary precautions must be taken to ensure
user safety. Failure to practice all necessary caution may result in
serious injury or death.

Hoppers are assumed to be empty for this calibration. If they are
loaded, material will be dispensed onto the ground.

Advertising