Guralp Systems CMG-6TD User Manual

Page 20

Advertising
background image

CMG-6TD

Installing the 6TD

4.3

Installation notes

For the best possible results, a seismometer should be installed on a seismic

pier in a specially-built vault, where conditions are near perfect. Here,
wave-trains arriving at the instrument reflect very well the internal motion of

subsurface rock formations. However, this is not always feasible. For
example,

instruments may need to be deployed rapidly, perhaps to monitor the
activity of a volcano showing signs of rejuvenation, or to study the

aftershocks of a major earthquake;

installations may be required in remote locations, or otherwise in

circumstances where it is infeasible to build a vault.

In these situations, the seismometer and its emplacement need to be

considered as a mechanical system, which will have its own vibrational
modes and resonances. These frequencies should be raised as high as

possible so that they do not interfere with true ground motion: ideally, beyond
the range of the instrument. This is done by

standing the sensor on bedrock where possible, or at least deep in
well-compacted subsoil;

clearing the floor of the hole of all loose material; and

using as little extra mass as possible in preparing the chamber.

In temporary installations, environmental factors are also important. The
sensor needs to be well protected against

fluctuations in temperature,

turbulent air flow around walls or trees, or around sharp corners or

edges in the immediate vicinity of the sensor;

vibration caused by heavy machinery (even at a distance), or by

overhead power lines.

This can be done by selecting a suitable site, and placing the instrument in a

protective enclosure. An open-sided box of 5 cm expanded polystyrene slabs,
placed over the instrument and taped down to exclude draughts, makes an

excellent thermal shield.

After installation, the instrument case and mounting surface will slowly

return to the local temperature, and settle in their positions. This will take
around four hours from the time installation is completed.

MAN-T60-0002

20

Issue F - February 2014