2 rack mounting – PLANET WGSW-50040 User Manual

Page 22

Advertising
background image

2-5

Step5: Supply power to the Managed Switch.

Connect one end of the power cable to the Managed Switch.

Connect the power plug of the power cable to a standard wall outlet.

When the Managed Switch receives power, the Power LED should remain solid Green.

2.2.2 Rack Mounting

To install the Managed Switch in a 19-inch standard rack, please follows the instructions described below.

Step1: Place the Managed Switch on a hard flat surface, with the front panel positioned towards the front

side.

Step2: Attach the rack-mount bracket to each side of the Managed Switch with supplied screws attached to

the package.

Figure 2-5

shows how to attach brackets to one side of the Managed Switch.

Figure 2-5 Attach brackets to the Managed Switch.

You must use the screws supplied with the mounting brackets. Damage caused to the

parts by using incorrect screws would invalidate the warranty.

Step3: Secure the brackets tightly.

Step4: Follow the same steps to attach the second bracket to the opposite side.

Step5: After the brackets are attached to the Managed Switch, use suitable screws to securely attach the

brackets to the rack, as shown in

Figure 2-6

.

Figure 2-6 Mounting WGSW-50040 in a Rack

Step6: Proceeds with the steps 4 and steps 5 of session 2.2.1 Desktop Installation to connect the network

cabling and supply power to the Managed Switch.

Advertising