2 in-band management, 1 management via telnet – PLANET WGSW-50040 User Manual

Page 28

Advertising
background image

3-11

Step 3: Entering switch CLI interface

Power on the switch, the following appears in the HyperTerminal windows, that is the CLI configuration mode

for Switch.

Testing RAM...

0x077C0000 RAM OK

Loading MiniBootROM...

Attaching to file system ...

Loading nos.img ... done.

Booting......

Starting at 0x10000...

Attaching to file system ...

……

--- Performing Power-On Self Tests (POST) ---

DRAM Test....................PASS!

PCI Device 1 Test............PASS!

FLASH Test...................PASS!

FAN Test.....................PASS!

Done All Pass.

------------------ DONE ---------------------

Current time is SUN JAN 01 00:00:00 2006

……

Switch>

The user can now enter commands to manage the switch. For a detailed description for the commands,

please refer to the following chapters.

3.1.2 In-band Management

In-band management refers to the management by login to the switch using Telnet, or using HTTP, or using

SNMP management software to configure the switch. In-band management enables management of the

switch for some devices attached to the switch. In the case when in-band management fails due to switch

configuration changes, out-of-band management can be used for configuring and managing the switch.

3.1.2.1 Management via Telnet

To manage the switch with Telnet, the following conditions should be met:

1) Switch has an IPv4/IPv6 address configured;

2) The host IP address (Telnet client) and the switch’s VLAN interface IPv4/IPv6 address is in the same

network segment;

3) If 2) is not met, Telnet client can connect to an IPv4/IPv6 address of the switch via other devices,

such as a router.

Advertising