Verifying power and grounding connections, Power terminal connectors, Assembling the etsi (front access) power connector – Symmetricom EDGE CLOCK 1000 User Manual

Page 62

Advertising
background image

Chapter 3 Installing the TimeProvider
Making Connections

62

TimeProvider User’s Guide

097-58001-02 Revision G – April 2008

Figure 3-5.

Power Terminal Connectors

Figure 3-6.

Assembling the ETSI (Front Access) Power Connector

Expansion Panel
All connections to the Expansion Panel, including power, are made using the
interconnection cable, part number 060-58002-03.

Verifying Power and Grounding Connections

To verify power and grounding connections:

1. Using a DVM, measure the voltage between pins 1 and 2 on the rear access

(NEBS) connector or between pins 2 and 3 of the front access (ETSI) connector.

2. Verify that voltage is –36 to –72 V DC. The inputs are protected against reverse

polarity.

Pin 1: -48 V DC Battery

Pin 2: -48 V DC RTN

Rear Access Shelf

Front Access Shelf

Pin 1: Frame ground

Pin 2: -48 V DC negative lead

Pin 3: Return

Advertising
This manual is related to the following products: