Hale FoamLogix 6.5 User Manual

Page 100

Advertising
background image

Electrical Installation

100

FoamLogix 3.3 / 5.0 / 6.5 Installer / Operations Manual

p/n: 029-0021-68-0

Figure 3-41: Remote Activation Switch Installation Dimensions

1.

Insert switch assembly through the panel cutout and secure to using the
#10-24 UNC x 1/2” (13mm) screws and nuts provided.

Note: When making cable connections, make sure the cable is routed by the
shortest most direct route. A maximum of 40 feet (12 meters) of remote cable
may be used.

2.

Connect the remote activation switch cable from the main cable harness
connector C2. (See Figure 3-32: “Single Tank Electrical Harness Over-
view” on page 87.)
Also see Figure 3-33: “Dual Tank Electrical Harness
Overview” on page 88.

Advertising
This manual is related to the following products: