FoamLogix 3.3 / 5.0 / 6.5 Installer / Operations Manual
p/n: 029-0021-68-0

Sta rt -Up Chec k L is t

3.9

SYSTEM INSTALLER START-UP

When energizing the Hale FoamLogix system at the system installer facility
for the first time the following procedures shall be used.

Initial System Power Check

Observe the display on the con-
trol unit while energizing the
apparatus electrical system. On
initial power up of the apparatus,
the Hale FoamLogix system
begins a brief self-diagnostic rou-
tine. When completed, the sys-
tem enters the STANDBY or
System Ready mode. (See Fig-
ure 3-43: “Initial Start-Up, System
Ready Displays.”)

Check the control unit readout —
FLOW, TOTAL FLOW, % FOAM,
TOTAL FOAM
and that all bar
graph LEDs illuminate along with
88888 for several seconds.

HALE CLASS 1 2002 scrolls
across the display during the self-
diagnostics, followed by the
default display. The default dis-
play is zero on the digital readout
(if no water is flowing) and FLOW
LED. (See Figure 3-43: “Initial
Start-Up, System Ready Dis-
plays.”)

If the system ready display does
not appear, see Section “7 Trou-
bleshooting” on page 141 for
more information.

Note: Pressing the DISPLAY but-

ton (

i

) cycles through the four

functions as indicated by the red
LED illuminating under each func-
tion (FLOW, %, TOTAL FLOW and
TOTAL FOAM).

Figure 3-43: Initial Start-Up, System

Ready Displays