7 start up check list, Electrical – Hale FoamLogix 6.5 User Manual

Page 101

Advertising
background image

101

FoamLogix 3.3 / 5.0 / 6.5 Installer / Operations Manual
p/n: 029-0021-68-0

Sta rt -Up Chec k L is t

3.7

START UP CHECK LIST

Before energizing the apparatus and the Hale FoamLogix system for the
first time make sure the following items are checked:

Electrical

Refer to the following for an overview of electrical connections:

Figure 3-33: “Dual Tank Electrical Harness Overview” on page 88

Figure 3-34: “Control/Display Unit Mounting Dimensions” on page 89

For cable harness overviews, see Section “ 9 Plate Drawings,” beginning on
page 170.

Figure 3-35: “Distribution Box Connections” on page 90

Tank LOW level sensor wires extended, if necessary, and connected to
main cable harness (C10, C11).

Tank LOW level sensor wires sealed against moisture with silicone seal-
ant provided.

Tank LOW level sensor(s) function properly.

For single tank operation, if the Hale MST is not used, check that the
tank select jumper plug is installed at connector C8.

Control cable connection at distribution box is correct and tight.

Flow sensor cable properly connected to main cable harness (C3).

All cables and wires are secured and protected from damage during
operation.

Control and flow sensor cables properly folded and secured; radio anten-
nas, power lines and equipment away from cables.

Foam pump and motor assembly properly grounded using flat ground
strap.

Correct voltage provided. Direct current, negative (–) ground.

Adequate current, 60 AMPS minimum, available. Main power direct to
battery, battery switch or solenoid without primer or other accessories
tied in.

Primary electrical and ground connections tight and protected from cor-
rosion with silicone sealant.

Splices in wires sealed from moisture using adhesive filled heat shrink
tubing.