Lenze L-force I/O System 1000 User Manual

Page 20

Advertising
background image

L-force Controls | I/O System 1000

Configuring the station structure

Creating a new project (select component from catalogue)

20

L

2.0 EN - 11/2010

7. Enter the filing location for the project directory in the Directory input field.

• If the indicated directory is not available, it will be recreated.
• You can optionally select an available directory via the Browse... button.
• If you select the Always save projects here option, the indicated directory will

be the standard memory location for new projects.

8. Press Complete.

• The Insert a component dialog box appears.
Step 4 - Component

9. Select the I/O system tab.

• The Search results list field displays all I/O systems available.

10. Select the "I/O system 1000: CAN" module from the Search results list field.

• More details and technical data of the selected module are displays on the right

side.

11. Press Next.

Advertising