BaseStation 1000 Irrigation Controller Manual

8. Press the  button to highlight one of the following start settings, and then press the OK

button:

Setting

Monitoring Soil Moisture Levels

Monitoring Pond/Cistern Levels

Less Than Limit

(Lower Limit)

Use this option to START the

program when the soil moisture is

less than the number in the

Moisture Limit field.

With this condition, you can set

the limit with a calibration cycle.

Use this option to STOP the

program when the water level in

the pond or cistern is less than

the number in the Moisture

Limit field.

Refer to Setting a Stop Condition

for a Program on page 52.

Greater Than

Limit

(Upper Limit)

Use this option to STOP the

program when the soil moisture is

greater than the number in the

Moisture Limit field.

Refer to Setting a Stop Condition

for a Program on page 52.

Use this option to START the

program when the water level in

the pond/cistern is greater than

the number in the Moisture

Limit field.

You cannot use a calibration

cycle to set the limit for this

condition.

9. If you want the moisture start condition to run only on specific days and times, press the 

button to highlight Only on Day & Time, and then press the OK button to display a checkmark

next to the option. Press the  button to configure the start days and start times. Refer to

the procedure for Setting the Day and Time Start Condition on page 40.

Note: When you use this setting to associate the day and time start with the soil moisture

start condition, the program starts when both the day/time and the moisture condition has

been met. When you have an additional start condition set, such as Interval or Smart Interval,

these settings will control the next start time. Be aware that watering can be delayed by these

additional start conditions.

10. Press the  button to highlight the Calibration field. This field only displays when you select

the Less Than Limit.

If the calibration has not been enabled, the Start? option displays on the right side of

the screen. To start the calibration, highlight the Start? option, and then press the OK

button.

If the calibration has been enabled, the Stop? option displays on the right side of the

screen. To stop the calibration, highlight the Stop? option, and then press the OK

button.

Note: When you enable calibration, the process either starts immediately or at the next day

and time start. The program puts down 150% of the required water and then waits for 24

hours. The calibration reading is taken when the soil moisture is at field capacity. After the

calibration cycle runs one time, it is disabled in the controller.

11. Press the RUN button to exit Program Setup.