Baseline Systems BaseStation 1000 User Manual

Page 59

Advertising
background image

BaseStation 1000 Irrigation Controller Manual

c.

Press the  button to highlight one of the following stop settings, and then press

the OK button:

Setting

Monitoring Soil Moisture

Levels

Monitoring Pond/Cistern

Levels

Less Than Limit

(Lower Limit)

Use this option to START the

program when the soil

moisture is less than the

number in the Moisture

Limit field.

Refer to Setting a Moisture

Start Condition on page 42.

Use this option to STOP the

program when the water

level in the pond/cistern is

less than the number in the

Moisture Limit field.

Greater Than

Limit

(Upper Limit)

Use this option to STOP the

program when the soil

moisture is greater than the

number in the Moisture

Limit field.

With this condition, you can

set the limit with a

calibration cycle.

Use this option to START the

program when the water

level in the pond/cistern is

greater than the number in

the Moisture Limit field.

Refer to Setting a Moisture

Start Condition on page 42.

d. Press the  button to highlight the Stop field, and then press the + or button to

alternate between “At End of Cycle” and “Immediately.” Select one of the options

to indicate when the moisture reading will cause your program to stop.

Note: To understand how these settings work with soak cycles and the various

watering strategies, refer to Using Soak Cycles with Soil Moisture Sensors on

page 11.

e. Press the  button to highlight the Calibration field. This field only displays when

you select the Greater Than Limit.

o

If the calibration has not been enabled, the Start? option displays on

the right side of the screen. To start the calibration, highlight the Start?

option, and then press the OK button.

o

If the calibration has been enabled, the Stop? option displays on the

right side of the screen. To stop the calibration, highlight the Stop?

option, and then press the OK button.

Note: When you enable calibration, the process either starts immediately or

at the next day and time start. The program puts down 150% of the required

water and then waits for 24 hours. The calibration reading is taken when the

soil moisture is at field capacity. After the calibration cycle runs one time, it is

disabled in the controller.

Page 53

Advertising