Utility port – Rice Lake TransAct 5.0 - Installation & Operation Manual User Manual
Page 114
Advertising
103
Utility Port
Test Screen
The Utility Port test screen is used to test the utility function selected in the setup screen.
How to Get Here
Admin-->Preferences-->Utility Port-->Test Button
Field Descriptions
Data to Send
Set this field to a number that will be displayed on the scoreboard. This number will be
formatted as either a weight or a dollar amount.
Advertising