Utility port – Rice Lake TransAct 5.0 - Installation & Operation Manual User Manual

Page 114

Advertising
background image

103

Utility Port 

Test Screen 

The Utility Port test screen is used to test the utility function selected in the setup screen.

How to Get Here

Admin-->Preferences-->Utility Port-->Test Button

Field Descriptions

Data to Send

Set this field to a number that will be displayed on the scoreboard. This number will be
formatted as either a weight or a dollar amount.

Advertising