Rice Lake TransAct 5.0 - Installation & Operation Manual User Manual

Page 220

Advertising
background image

209

NOTE: The Details button is not available until changes made to the tare grid
have been saved or undone.

Add Materials

1. Click Admin | Categories | Material

2. Click the NEW button, if a blank form does not appear

3. Enter information:

Code (required)

Description (required)

4. Select an Inventory Unit of Measure

5. Click the SAVE button (To add additional materials, repeat steps 2 - 4)

Add a Price Table

1. Click Admin | Categories | Price Table

2. Click the NEW button, if a blank form does not appear

3. Enter information

Code (required)

Description (required)

4. Click the Save button

Add a New Job

1. Click Admin | Orders/Jobs

2. Click the NEW button, if a blank form does not appear

3. Enter Order information

Id (required)

Description (required)

Customer (required)

Ordered Date (required)

4. Click the SAVE button (To add additional jobs, repeat steps 2 - 4)

Enter Special Job Pricing

1. Select the Material from the drop-down list

2. Enter the price.

3. Click the Add Item button to add additional Materials

4. Click the Save button

Advertising