2 wastewater connection, Ole_link5 – BINDER KBF LQC 240 User Manual

Page 26

Advertising
background image

KBF LQC (E5.3) 07/2014

page 26/114

4.2 Wastewater connection

Fasten the wastewater hose to the waste-water connection “OUT” (17) on the rear of the unit (olive ∅ 14

mm). Observe the following points:

You can use a part of the delivered water hose as a drainage hose. In case another hose is used, it

has to be permanently resistant against at least 95 °C / 203°F.

Mount the wastewater hose with a maximum positive inclination of 1 m and a maximum total length of

3 m.

Protect both ends of the drainage hose with two of the four delivered hose clamps.

Waste water is collected in an internal can with a volume of approx. 0.5 liters. It is pumped off

only when required, thus there is no continuous waste water flow.












(22)

(16)

(18) (17)











(16) Power cable
(17) Waste-water connection “OUT” with hose

olive for hose ½“

(18) Freshwater connection “IN” with screw

thread ¾’’ for hose ½“, with union nut

(22) Socket for optional freshwater can (chap.

17.9.1)

Figure 10: Rear view KBF LQC with water connections

Protect the waste water supply at both sides with the delivered hose clamps.

Advertising
This manual is related to the following products: