RLE FMS8 User Manual

Page 33

Advertising
background image

Falcon User Guide

33

Schedules
The

Schedules

link allows users to schedule the

activation and deactivation of relay outputs. This
is useful for cycling redundant equipment such as
chillers, generators, etc.

Press the

Submit Changes

button when done to

save all schedule changes.

Battery
The

Battery

link is used to configure power when

the Falcon is running off a 48V battery string.

Press the

Submit Changes

button when done to

save all battery configuration changes.

Advertising
This manual is related to the following products: