5 preparing for installation, 6 determining power requirements – FUJITSU TeamPoS 3000 XL User Manual

Page 41

Advertising
background image


TeamPoS 3000 XL and XL

2

Site Preparation

D900000145

Issue 3

4-3

4.5

Preparing for Installation:
Before installing equipment, perform the following steps:

• Move all terminal components, accessories, and cables to the locations

specified in your local site plan.

• Position the cables according to the site plan. Make sure you have the correct

data cable at each terminal location.

• Place the optional equipment next to the terminal to which it will be connected.

• Remove the shipping tape from those components that have been taped.

4.6

Determining Power Requirements

Electrical power to the equipment must comply with all local, state, and national
wiring codes and meet the requirements described here. If you do not have
qualified in-house personnel to ensure that power requirements are met, an
electrical contractor familiar with computer equipment should be hired. This
section provides the electrical supply data and main power cable information to
prepare a site for the installation of the TeamPoS 3000XL and XL

2

Series terminal.

This product is also designed for IT power systems with phase-to-phase voltage of
up to 240V.

Before installing the terminal, check the power lines for loads that could cause
large variations in voltage. Electrical devices that use a great deal of power such
as air conditioners, elevators, copying machines and large motors can cause large
drops in voltage. When severe electrical interference occurs, installing radio
frequency (RF) filters, or an isolation transformer, or both may be necessary. If
voltage surges caused by lightning are likely to occur, install an arrester.

Caution: To prevent data loss, do not plug other equipment that can

produce sudden surges (i.e., vacuum cleaners) into the same
power circuit as the terminal.

Advertising