Siemens S5-135U/155U User Manual

Page 91

Advertising
background image

4-25

System Manual
C79000-G8576-C199-06

The power supply unit is delivered with the settings shown in bold print in
the following table.

Mark your chosen settings in the right-hand column and use this chart for the
subsequent implementation.

Function Selection

Jumper

Setting

Application/Note

(X)

Battery monitor

switched on for
rechargeable battery and battery

MM - NN
MA - NA

closed
closed

Redundant backup

switched on for battery and
off for rechargeable battery

MM - NN
MA - NA

closed
open

If, for example, no redundance is
required in backup, i.e. the rechargeable
battery is missing

switched off

MM - NN
MA - NA

open
irrelevant

For example, monitoring is not needed
for EU without backup

Reaction of battery monitoring
following battery failure

/BAU signal active following
return of line voltage

MB - NB

open

/BAU signal active following
return of line voltage and during
operation

MB - NB

closed

The possibility of evaluating the battery
monitoring during operation is
dependent on the CPU in use

After failure of more than one fan or
inadequate air flow

PSU shutdown

F-R

closed

No PSU shutdown

F-R

open

Caution: To prevent overheating of
modules, the PSU must be shut down
after 60 s at the latest (for example, by
time relay)

Voltage monitor

switched off

BA-EX

closed

Monitoring of load voltage input
switched off

switched on

BA-EX

open

Monitoring of load voltage input
switched on

Relay alarm

Fault message initiated by fan
f il

/

i hibi

i

b

driven by fan monitor and
output inhibit

BB-AA

closed

g

y

failure/output inhibit active; can be
signaled to control room, for example.

driven only by fan monitor

BB-AA

open

Fault message initiated by fan failure;
can be signaled to control room, for
example.

Establishing the
Jumper Settings

Central Controllers and Expansion Units Power Supply Units

Advertising