Chapter 4 operation, Chapter 4, Operation – IAI America PSEL User Manual

Page 63: Startup, Chapter 4 operation 1. startup

Advertising
background image




53

Part 1 Installation

Chapter 4 Operation

1. Startup


(1) Connect the motor cable and encoder cable to the controller.
(2) Connect the PIO connector to the host PLC using the supplied flat cable.
(3) Execute an emergency stop.
(4) Connect the PC or teaching pendant.

Set the AUTO/MANU switch to the “MANU” side.

(5) Supply the 24-V PIO power through the flat cable.
(6) Turn on the control power and motor power at the same time. (They should be taken from the same

power supply.)

(7) Reset the emergency stop.

 The EMG lamp turns off.
 If the ALM lamp is lit, an error is present. Check the error list to identify the problem.


If the 24-V PIO power is not supplied, an “E69” error will generate.
To check for errors, connect the teaching pendant, PC software or panel unit.

Advertising