2.3.3 Installation of the SK TU2 technology unit

WARNING

Electric shock

Modules must not be inserted or removed unless the device is free of voltage. The slots may only be used for
the intended modules. Installation remote from the frequency inverter is not possible. It must be connected
directly to the frequency inverter.

Failure to comply with this may result in an electric shock, which my cause serious injury and the destruction of
the frequency inverter and the module.

Installing the technology unit

1. Switch off the mains voltage, observe

the waiting period.

2. Unscrew the 6 fastening screws of the

blind plate land remove the blind plate
(Fig.1).

3. Attach the PE connection on the inside

of the technology unit which is being
installed (Fig. 2). Fit the seal together
with the technology unit on the surface
of the frequency inverter. Ensure that
the connector strip makes full contact.

4. Lightly tighten all 6 fastening screws.

5. Now tighten the 6 fastening screws in

the specified sequence from 1 to 6 (see
Fig. 1) and with the torque stated in the
table.

Screw 4

Screw 3

Screw 2

Screw 1

Screw 6

Screw 5

Fig. 1

Fig. 2

Frequency inverter size

Screw size

Tightening torque

Size 1

M4 x 8

1.5Nm ± 20%

Size 2

NOTICE

Earthing / Grounding

Note the earthing cable!

Make sure the earthing line is plugged into the plate of the standard device and each technology unit. This cable
must be connected when installing the technology unit to ensure it is fully earthed. Operation is not permitted if
there is no secure PE connection to the frequency inverter and to the technology unit, beacause frequency
inverter and technology unit could be destroyed!