Removal, Removal -7 – JLG 1350SJP Service Manual User Manual

Page 241

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121142

– JLG Lift –

4-7

4.2

BOOM REMOVAL, DISASSEMBLY/ASSEMBLY, &
CABLE REPLACEMENT

Removal

1.

Place machine on firm, level ground.

2.

Slightly elevate the boom and support the fly boom
with a crane or an adequate lifting device capable of
handling 6 - 7 tons.

3.

Place blocking under lift cylinder to hold it in place.

4.

Remove lift cylinder pin securing the lift cylinder rod to
the boom.

5.

Remove the boom end cover.

6.

Tag and disconnect the telescope, tank, and pressure
hoses as indicated below from the main valve and cap
ends.

1.

Pivot Pin

2.

Bolt

3.

Keeper Pin

Advertising
This manual is related to the following products: