Boom assembly torque values - sheet 2 of 2 -30, Ef g – JLG 1350SJP Service Manual User Manual

Page 264

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-30

– JLG Lift –

3121142

E

F

G

Ft-Lbs.

Nm

E

340

460

F

480

672

G

190

260

Figure 4-9. Boom Assembly Torque Values - Sheet 2 of 2

NOTE:

If any rotator bolts are replaced, all bolts
on the rotator should be retorqued. Check
torque on the bolts every 150 hours of
operation.

Advertising
This manual is related to the following products: